Highway 61 Construction (2015)
Posted: Thu Jul 23, 2015 1:18 pm
Does anyone know if there is construction happening on Hwy 61 again this year?
If so, where? and how long is the delay?
If so, where? and how long is the delay?
Isle Royale Forums: a great resource to research and explore Isle Royale National Park!
https://isleroyaleforums.com/
That's the only construction noted for Hwy 61; I'll be driving up that road tomorrow and if I can get Internet, I'll try to post back how it goes. Otherwise I return on next Thursday's boat.Between Ridge (1 mile west of the Grand Marais area) and Birch Drive (near Grand Marais). The roadway is reduced to one lane. There is a width limit in effect. There is a length limit in effect. Road construction work is in progress. Approach with care. Width limit 12'0". Vehicle length limit 100 ft. Until October 1.
Comment: On MN 61 south of Grand Marais, NB lane will close for grading, paving, and bridge construction. Traffic will be directed to a single lane with a temporary bypass and signal system. NOTE: 100' length restriction added for OS/OW vehicles.
Last updated Today at 8:36 AM by MnDOT